RIGGING HARDWARE
Block & Tackle
Sheaves and rope combined into a system that trades distance for force — with friction taking its cut.
Rope, splices and hardware are only as good as their condition. Inspect before every use and retire on evidence.
Specification
| Sheave count | Single, double, triple |
|---|---|
| Bearings | Plain, roller, ball |
| Materials | Stainless, aluminium, composite |
| Rope diameter | Matched to sheave groove |
| Efficiency | ≈ 90–95% per sheave |
| Common error | Sheave too small for the rope |
Technical parameters
| 2-part tackle | Ideal MA 2, effective ≈ 1.9 |
|---|---|
| 3-part tackle | Ideal MA 3, effective ≈ 2.8 |
| 4-part tackle | Ideal MA 4, effective ≈ 3.6 |
| 6-part tackle | Ideal MA 6, effective ≈ 5.2 |
| Sheave ratio | Sheave ≥ 8 × rope diameter |
| Friction per sheave | 5–10% |
Overview
A block is a frame holding one or more sheaves, and a tackle is two or more blocks reeved together. The point of the assembly is mechanical advantage: with the right reeving, a small pull on the fall can raise a load several times heavier, at the cost of pulling several times as much rope.
The theoretical advantage is the number of rope parts supporting the load. A tackle with four supporting parts has an ideal advantage of four, so a 100 kg load needs roughly 25 kg of pull. In practice friction takes a share: each sheave costs something in the region of five to ten per cent, so a four-part tackle might deliver an effective advantage nearer three to three and a half.
Efficiency also depends on the sheave diameter relative to the rope, on the bearing type — plain, roller or ball — and on the rope itself. A stiff line round a small sheave loses far more to friction than a soft one round a large sheave, and the difference shows up as heat and effort.
Safety notes
- A block's rating applies to the block, not the assembly. The weakest element — shackle, rope, splice or anchor point — sets the limit.
- Sheave diameter should be at least eight times the rope diameter. A small sheave with a stiff rope both wastes effort and damages the line.
- Inspect sheaves for cracks, grooves for wear and the frame for distortion. A seized sheave turns a tackle into a chafe point.
Using it well
- Reeve so the fall exits in the direction you want to pull; the last sheave decides that.
- Use a becket or a shackle to anchor the standing block on the load side so the tackle shortens as it lifts.
- Watch the rope where it enters the first sheave — that is where chafe shows up first.
Suited to
Typical applications
Related tools
Shackle
The universal metal connector — a bow or Dee shackle with a pin, rated by working load limit.
Halyard
The line that hoists a sail — low stretch, spliced at both ends, sized to the winch.
Sheet Line
The line that trims a sail — handled constantly, so grip and abrasion resistance come first.
Dyneema Rope
Ultra-high-molecular-weight polyethylene — the strongest line by weight, with almost no stretch at all.
∞ CONTINUE
Where this fits
More in Rigging Hardware
Shackles, thimbles, blocks and the metal that carries the load.
Knot Strength Calculator
Work out what a knot costs you, and what the line can safely hold once it is tied.
3D Studio
Four interactive tools for knots, splices and rigging loads, running entirely in your browser.